Twenty thousand beta testers — what the park actually tests
A stage is harsher than a lab
Robotics is usually judged in a laboratory. Galaxy Corporation moved the verdict to the seats.
At the grand-opening press conference in August 2026 the company said it had run a beta test with about 20,000 people and found the response encouraging. Calling visitors beta testers was not a figure of speech. Galaxy Robot Park opened first in a July 2026 soft opening, drew roughly 8,000 booked visitors with every session sold out, and reached 20,000 cumulative visitors before the grand opening on 21 August.
A stage is a harsher condition than a lab. A demo has to work once; a show has to work at a fixed hour, again and again. The audience has paid, and has no reason to forgive a missed take. Galaxy's target of four or more shows a day and over 1,000 a year is a commitment to repeating that condition daily. Visitor information is on the Robot Park page.
Test one — robots per operator
The most legible measurement is how many robots a single operator drives at once. When the company first put a humanoid on stage at G-DRAGON's after-party in December 2025, one operator handled one robot. As of August 2026, one operator runs twelve from a single console. The company has set expansion to around 100 as its target.
We started with one, went to five at once, then twelve — and one person does it.— Choi Yong-ho, CEO, Galaxy Corporation
The number matters because of cost structure. If every robot needs its own operator, the show does not scale. Robots per operator is the line between a one-off spectacle and a permanent product, and the park's daily programme tests that line every day. The learning pipeline is set out in the Soulware whitepaper.
Test two — running a mixed fleet daily
The second test is whether robots from different manufacturers can run side by side in one venue. Galaxy does not build robot hardware. It drives machines from several makers through Soulware, its own operating system.
Seventeen new robot types joined at the grand opening on 21 August 2026, handling programmes such as portrait drawing, piano performance, and making pizza, cocktails and ice cream. Performance robots dancing in formation and service robots mixing drinks in front of visitors now share the same operating hours.
Keeping machines of that different a character under one operating system, every day, is also how the company finds out whether a strategy built on not owning the hardware actually holds. The reasoning behind it is covered in Orchestrating technology instead of owning it.
Test three — what brings people back
The third test is format. The Robot Arena runs K-pop formation dance and robot boxing as its standing programme, and on stage alongside human dancers the robots have handled moves as demanding as a taekwondo turning kick. Outside the arena sit hands-on encounters: a hugging robot, a robot dog, a drawing robot that sketches portraits.
Which formats end as a single look and which bring people back cannot be known at the design stage. Running both registers — spectacle and contact — side by side every day, and watching how visitors move and react, is how the answer arrives. Why K-pop choreography is the hardest test a humanoid can face is covered separately.
Moving what Seoul proved
What the testbed establishes travels to the next stage. On the company's stated plan, a robot arena opens in Dubai at the end of 2026, and a local entity is preparing a third and fourth park in the United States. A robot idol is to be unveiled in the first half of 2027, with a world tour from the second half.
Robots can go where people cannot, and perform in several places at once.— Choi Yong-ho, CEO, Galaxy Corporation (21 August 2026)
Choi noted that K-pop world tours currently reach 30 to 35 countries, and said robots would widen that to around 100. For the idea to hold, a learned performance has to reproduce itself when the venue changes. The show repeating daily in Seoul is the record that builds that case. The Middle East base is set out in the Galaxy ME entity page.
What the park has not answered
Twenty thousand includes first-curiosity demand. Early visitors to a venue billed as a world first will include one-time trips with no intention of returning, and sold-out pre-opening sessions cannot separate the two.
Time makes the separation. More than 1,000 shows a year is a target and a test at once. Whether the seats still fill when the same programme runs all year, and whether new robots and new routines produce return visits, only shows up as operating months accumulate. The figures the company has released run to the grand opening; attendance data after that has not been published.
Frequently asked questions
Q. Why is Galaxy Robot Park described as a testbed?
Because the company said at its grand-opening press conference that it had run a beta test with about 20,000 people. The park's standing programme is where robots per operator, daily operation of a mixed fleet, and the formats visitors return for are checked under real operating conditions.
Q. How many robots can be controlled at once?
As of August 2026, one operator runs twelve robots from a single console. In December 2025 one operator handled one robot, and the company has set expansion to around 100 as its target.
Q. Does Galaxy Corporation build the robots itself?
No. The company does not manufacture hardware; it drives robots from several makers through its own operating system, Soulware. The structure is described in the Soulware whitepaper and the partnership FAQ.
Q. Where does what the park proves go next?
The company's stated plan is a Dubai robot arena at the end of 2026, a third and fourth park in the United States prepared through a local entity, a robot idol in the first half of 2027 and a world tour from the second half. The full sequence is in the timeline.